Development laboratory
Project Refurbishment of an existing analytical and microbiology laboratory to create a DPD (Drug Product Development) laboratory Identification of user […]
06/12/2021
Filter by Key Issues
Filter by insight type
Production
Engineering & Commissioning
Project Refurbishment of an existing analytical and microbiology laboratory to create a DPD (Drug Product Development) laboratory Identification of user […]
06/12/2021
Production
Engineering & Commissioning
Project Implementation of a Blow Fill Seal (BFS) line: sterile veterinary eye drops in single/multi-doses in a new building. Challenges […]
06/12/2021
Production
Engineering & Commissioning
Project underway since 2013 Team CEA Cadarache 6 people ITER 56 people Achievements Mechanical engineering Studies (design, integration, layout) Calculation […]
06/12/2021
Production
Engineering & Commissioning
Project Implementation of a service contract for the engineering and qualification of USP/DSP production equipment: Mobile tanks with options (agitation, […]
30/11/2021
Production
Engineering & Commissioning
Project Transformation of the last resort Silos S2 and S4 into secondary evacuation Connection of Silos S2 Non-compliant ash to […]
30/11/2021
Production
Engineering & Commissioning
Project Design and implementation of all techniques in the new cyclotron radioisotope centre. HVAC: heating, cooling, (process) air conditioning, ventilation, […]
30/11/2021