Engineering & Commissioning Radioisotope production centre

Project

  • Design and implementation of all techniques in the new cyclotron radioisotope centre.
  • HVAC: heating, cooling, (process) air conditioning, ventilation, humidity control, air purification.
  • E&I: low voltage installation, data, fire detection, access control, lighting simulation.
  • Hydraulics: sanitary, water treatment, clean and black piping, special fluids.

Summary

Study duration

1

month

Mission

Detailed design of special techniques: HVAC & E&I

Dimensioning
CAO & DAO
Specifications

Expertise

  • HVAC
  • E&I
  • Special fluids
  • Revit / BIM

Engineering & Commissioning

Development laboratory

06/12/2021

Julia Moynier

Engineering & Commissioning

Implementation of a BFS line

06/12/2021

Julia Moynier

Featured