Engineering & Commissioning 3D design of last resort diesel equipment

Project

  • Transformation of the last resort Silos S2 and S4 into secondary evacuation
  • Connection of Silos S2 Non-compliant ash to secondary discharge
  • Connection of the S4 Ash Silo to the secondary discharge
  • Integration of technical modifications to improve the current system
  • Creation of a 3D global model 3D modelling of an HDPS
  • Integration of different air and alumina circuits Analysis and anticipation of manufacturing problems
  • Supporting booklet
  • Isometrics of fluidisation pipes

Summary

Duration

3

months

Deliverables

3D design

Definition files 2

ISO plan

Software

Creo / Autocad / PDM Windchill

Team

8

Personnes

Methodology developed

Implementation of a multi-skilled project platform managed by Fortil

Hydraulics, Fluidisation, Structure, Carpentry, Sheet Metalwork, Quality Control

17% shorter lead time through an AGILE industrial organisation

Engineering & Commissioning

Development laboratory

06/12/2021

Julia Moynier

Engineering & Commissioning

Implementation of a BFS line