Project
- Transformation of the last resort Silos S2 and S4 into secondary evacuation
- Connection of Silos S2 Non-compliant ash to secondary discharge
- Connection of the S4 Ash Silo to the secondary discharge
- Integration of technical modifications to improve the current system
- Creation of a 3D global model 3D modelling of an HDPS
- Integration of different air and alumina circuits Analysis and anticipation of manufacturing problems
- Supporting booklet
- Isometrics of fluidisation pipes