NANO Nuclear and fortil Advance Engineering Collaboration for the KRONOS MMR™ Fuel Handling & Storage System

July 22, 2026 | New York, N.Y. & Ollioules, France Download press release Engineering milestone evidences continued maturation of the KRONOS MMR™ Energy System, reducing technical risk while supporting advancement toward future first-of-a-kind deployment, component standardization, and commercialization. NANO Nuclear Energy Inc. (NASDAQ: NNE) and fortil announced the advancement of their strategic engineering collaboration on […]
Turbine bypass improvement studies for a Waste-to-Energy plant

Contact an expert about your project Improving the turbine bypass system: context and challenges As part of the improvement of its turbine bypass system at a live Energy Recovery Facility (ERF), our client Viridor commissioned fortil to carry out the associated engineering studies. The primary objective was to define a new low-flow bypass system, connected […]
Boiler water circulation optimization for a Waste-to-Energy plant: hydraulic studies, retrofit engineering and piping modifications

Contact an expert about your project Improving boiler water circulation at a Waste-to-Energy plant As part of a boiler improvement project at a Waste-to-Energy (WtE) plant in France, our client, a leading industrial boiler manufacturer, commissioned our engineering team to perform detailed water circulation studies within the steam generator. The objective was to improve the boiler’s performance, […]
Front-end engineering design for the modification of a district heating network

Contact an expert about your project Increasing Thermal Capacity on a Waste-to-Energy Facility As part of the development of its district heating network, integrated into a waste-to-energy facility, our client launched a project to increase the thermal output of its site. A global player in water and waste management, they entrusted fortil with the Front-End […]
fortil wins SNCF Réseau national framework contract for railway signalling studies

fortil Mobility, alongside its partners SYSTRA France and BETA, has been awarded a national framework contract by SNCF Réseau for railway signalling studies, effective June 2025. As a result, this strategic award confirms fortil’s position as a key player in railway engineering in France. Contact an expert about your project A major national framework contract […]
fortil Mobility awarded a railway signalling engineering framework contract with RATP

In 2025 fortil Mobility has been appointed engineering manager on a framework contract with RATP’s Signalling and Railway Telecommunications division. The contract runs for three years, with two optional extensions, on a lump-sum, results-based basis. A significant milestone that cements fortil Mobility’s position as a go-to partner in French urban rail. Contact an expert about […]
fortil Mobility wins SNCF national framework agreement for railway engineering

fortil Mobility strengthens its position in the railway sector by securing a national framework agreement awarded by SNCF. This railway engineering contract, valid for 3 years with a 2-year renewal option. It covers the full scope of engineering studies, industrial methods, and project management services for rolling stock maintenance facilities (technicentres). These strategic industrial sites […]
Data protection in 2026: regaining control against emerging risks

In 2026, protecting sensitive data is no longer just about defending against cyberattacks. For organizations, the challenge now also lies in ensuring that their data is not exploited, intentionally or unintentionally, by external artificial intelligence systems, without control or visibility. Data protection starts with a simple but often overlooked question: Do you know what data […]
Design of a Steam Turbine Exhaust Duct for a Waste-to-Energy Plant in Europe

Project summary 3 experts 6 months England Energy Project description Our team designed a 4.8-meter diameter steam turbine exhaust duct (ACC duct) for SPIG-GMAB, a European leader in air-cooled condenser design. Initially, the project was part of the construction of a new waste-to-energy facility and required expertise in piping engineering, plant layout, and finite element […]