Études d'amélioration d'un contournement turbine vapeur sur une Unité de Valorisation Energétique

Contact an expert about your project Improving the turbine bypass system: context and challenges As part of the improvement of its turbine bypass system at a live Energy Recovery Facility (ERF), our client Viridor commissioned fortil to carry out the associated engineering studies. The primary objective was to define a new low-flow bypass system, connected […]
Optimisation de la circulation d’eau d’une chaudière sur une UVE : études hydrauliques, revamping et modifications de tuyauterie

Contact an expert about your project Improving boiler water circulation at a Waste-to-Energy plant As part of a boiler improvement project at a Waste-to-Energy (WtE) plant in France, our client, a leading industrial boiler manufacturer, commissioned our engineering team to perform detailed water circulation studies within the steam generator. The objective was to improve the boiler’s performance, […]
Études d'avant-projet détaillé pour la modification d'un réseau de chauffage urbain

Contact an expert about your project Increasing Thermal Capacity on a Waste-to-Energy Facility As part of the development of its district heating network, integrated into a waste-to-energy facility, our client launched a project to increase the thermal output of its site. A global player in water and waste management, they entrusted fortil with the Front-End […]
Conception d’une gaine d’échappement turbine pour une usine d’incinération en Europe

Project summary 3 experts 6 months England Energy Project description Our team designed a 4.8-meter diameter steam turbine exhaust duct (ACC duct) for SPIG-GMAB, a European leader in air-cooled condenser design. Initially, the project was part of the construction of a new waste-to-energy facility and required expertise in piping engineering, plant layout, and finite element […]